Division 15 - Mechanical
Design & Construction
Section Number |
Title |
Latest Revision |
15010 (23 00 00) | Basic Mechanical Requirements | Jan. 2019 |
15030 | Electrical Requirements for Mechanical Equipment | Apr. 2005 |
15050 | Basic Mechanical Materials and Methods | Apr. 2005 |
15060 | Basic Piping Materials and Methods | Jan. 2012 |
15061 | Hydronic Piping | Nov. 2007 |
15062 | Steam and Condensate Piping | Jan. 2012 |
15063 | Fuel Oil and Propane Systems | Mar. 2003 |
15064 | Special Piping Systems | |
15100 | Valves | Jan. 2012 |
15130 (23 05 19) | Meters and Gages | Jan. 2019 |
15140 | Hangers and Supports | Jan. 2012 |
15160 | Pumps | Feb. 2006 |
15190 | Mechanical Identification | Mar. 2003 |
15240 | Seismic Restraints and Vibration Control | Sept. 2004 |
15250 | Mechnical Insulation | Nov. 2007 |
15300 | Fire Protection | Nov. 2007 |
15410 | Water Distribution Piping | Jan. 2012 |
15420 | Drainage and Vent Systems | Jan. 2012 |
15440 | Plumbing Fixtures | Jan. 2012 |
15480 | Water Heaters | Jan. 2012 |
15570 | Condensate Pump and Receiver Sets | Jan. 2012 |
15710 | Cooling Towers | Nov. 2007 |
15740 | Condensing Units | |
15741 | Ductless Split Air Conditioners | |
15742 | Absorption Chillers | Nov. 2007 |
15743 | Reciprocating Chillers | Nov. 2007 |
15744 | Centrifugal Chillers | Nov. 2007 |
15749 | Water Treatment Systems | Jan. 2012 |
15755 | Heat Exchangers | Sept. 2004 |
15810 | Humidifiers | Apr. 2005 |
15830 | Heating and Cooling Terminal Units | Mar. 2003 |
15845 | Energy Recovery Units | Jan. 2012 |
15855 | Custom Air Handling Units | Jan. 2012 |
15856 | Modular Air Handling Units | Jan. 2012 |
15860 | Fans | |
15880 | Rooftop Heating and Cooling Units | |
15890 | Metal Ductwork and Accessories | Jan. 2012 |
15990 (23 05 93) | Testing, Adjusting, and Balancing | Jan. 2019 |
Last Updated