Project at a Glance
|
Type Of Project:
|
|
Parking Lot, New Construction
|
|
|
|
Number of Parking Spaces:
|
|
386
|
|
|
|
Estimated Start of Construction:
|
|
September 2008
|
|
|
|
Estimated Completion:
|
|
May 2009
|
|
|
|
Construction Manager:
|
|
Trumbull-Nelson Construction
|
|
|
|
Design Engineer:
|
|
Engineering Ventures
|
|
|
The facility will be a paved surface parking lot incorporating the following program elements:
- Accommodate +/- 400 vehicles
- Access shall be via an existing easement crossing DHMC & Hitchcock Clinic property to Dartmouth Library Storage
- The property is occupied through a long-term lease from the property owners, Fuller Enterprises, Inc., with the right to purchase at the conclusion of the lease
- Public Transportation to Hanover with 10 minute head times during rush hours 6:30-9 AM and 3-6PM. 30 minute head times 9AM - 3PM and 6 PM - 7PM.
- Minimize stormwater runoff from current conditions.
|