Project at a Glance

Game Day Photo at Biondi Park

Type Of Project:

Athletic Field Renovation

Plans, Renderings, and Elevations

Construction Cost:

$4,130,000

Construction Photos

Seating Capacity

632

Start of Construction:

June 2008

Completed

April 2009

Field Design Consultant

Gale Associates

Bleachers Architect

Lavallee Brensinger

Field Design Consultant

Clark Companies

 

The existing Red Rolfe Field was replaced with a new playing surface, including a new artificial turf field with an integrated sub-surface drainage system. The project also includes a new bleacher structure, providing a mix of individual chair and bench-back spectator seating, handicap-accessibility, perimeter landscaping, dugouts, batting cages, bullpens and other field amenities. The project is also designed to accommodate the portable bleachers used at Memorial Field, when necessary, which adds another 1,200 seats to the field capacity.