Project at a Glance
|
Type Of Project: |
Athletic Field Renovation |
|||
|
Estimated Construction Cost: |
$4,130,000 |
|||
|
Seating Capacity |
632 |
|||
|
Start of Construction: |
June 2008 |
![]() |
||
|
Estimated Completion: |
April 2009 |
|||
|
Field Design Consultant |
||||
|
Bleachers Architect |
||||
|
Field Design Consultant |
The existing Red Rolfe Field will be replaced with a new playing surface, including a new artificial turf field with an integrated sub-surface drainage system. The project also includes a new bleacher structure, providing a mix of individual chair and bench-back spectator seating, handicap-accessibility, perimeter landscaping, dugouts, batting cages, bullpens and other field amenities. The project is also designed to accommodate the portable bleachers used at Memorial Field, when necessary, which adds another 1,200 seats to the field capacity.