Main entry, windows installed. |
Alumni Gym, from the roof. |
Baseball field and Berry Sports, from the roof. |
|
Third floor office space, facing the baseball field. |
Another third floor office. |
Third floor classroom and football lounge area, facing the field. |
|
Third floor hallway, leading into football team office space. |
Fan coil unit, waiting to be installed. |
Third floor office space. |
|
Football reception area. |
Football staff conference room. |
Head football coach's office. |
|
Third floor hallway, looking north. |
Mechanical penthouse. |
Pumps in the mechanical penthouse. |
|
Slab for mechanical equipment in the penthouse. |
Chiller enclosure, roof. |
Baseball field seen from the roof. |
|
Football field, from the roof. |
More of the football field. |
Exterior of the mechanical penthouse. |
|
Strength training facility. |
Windows in the strength training facility. |
First floor tiered classroom. |
|
Satellite sports medicine room. |
Exit to baseball field. |
Football locker room. |
|
Football locker room. |
Football showers. |
Football showers. |
|
|
||
|
Elevator shaft, looking up. |
Exterior and stands. |
|
|
Generator enclosure, south side of building. |
Closer view of the generator enclosure. |
Masonry for restroom facility underway. |
|
First floor classroom progress. |
Football equipment room. |
Football locker room. |
|
Football showers. |
Generator enclosure, with generator. |
Exterior wall, alongside the baseball field. |
|
Davis Varsity House and the football field from the roof. |
Mechanical equipment in place in penthouse. |
Finished exterior of the penthouse. |
|
Football reception room.. |
Football lounge. |
Football staff conference room. |
|
Strength training facility progress. |
Detail of strength training archways. |
Main entrance windows, from the interior. |
|
Main entrance, foyer. |
Masonry progress for the restroom facility. |
Materials in place for extending the stands. |