Floren Varsity House : : Construction Images

Spring 2007

Photosets: April 9 :: May 15 :: June 5

 

Photos from April 9, 2007

040907_01

040907_02

040907_03

Main entry, windows installed.

Alumni Gym, from the roof.

Baseball field and Berry Sports, from the roof.

040907_06

040907_07

040907_08

Third floor office space, facing the baseball field.

Another third floor office.

Third floor classroom and football lounge area, facing the field.

040907_10

040907_11

040907_12

Third floor hallway, leading into football team office space.

Fan coil unit, waiting to be installed.

Third floor office space.

040907_13

040907_14

040907_15

Football reception area.

Football staff conference room.

Head football coach's office.

040907_16

040907_18

040907_19

Third floor hallway, looking north.

Mechanical penthouse.

Pumps in the mechanical penthouse.

040907_20

040907_21

040907_22

Slab for mechanical equipment in the penthouse.

Chiller enclosure, roof.

Baseball field seen from the roof.

040907_23

040907_24

040907_25

Football field, from the roof.

More of the football field.

Exterior of the mechanical penthouse.

040907_26

040907_27

040907_28

Strength training facility.

Windows in the strength training facility.

First floor tiered classroom.

040907_29

040907_30

040907_31

Satellite sports medicine room.

Exit to baseball field.

Football locker room.

040907_32

040907_33

040907_34

Football locker room.

Football showers.

Football showers.

040907_35

040907_36

 

Elevator shaft, looking up.

Exterior and stands.

 

 


Photos from May 15, 2007

051507_01

051507_02

051507_03

Generator enclosure, south side of building.

Closer view of the generator enclosure.

Masonry for restroom facility underway.

 


Photos from June 6, 2007

060607_01

060607_02

060607_03

First floor classroom progress.

Football equipment room.

Football locker room.

060607_04

060607_05

060607_06

Football showers.

Generator enclosure, with generator.

Exterior wall, alongside the baseball field.

060607_07

060607_09

060607_10

Davis Varsity House and the football field from the roof.

Mechanical equipment in place in penthouse.

Finished exterior of the penthouse.

060607_11

060607_12

060607_13

Football reception room..

Football lounge.

Football staff conference room.

060607_14

060607_15

060607_16

Strength training facility progress.

Detail of strength training archways.

Main entrance windows, from the interior.

060607_17

060607_18

060607_19

Main entrance, foyer.

Masonry progress for the restroom facility.

Materials in place for extending the stands.

 