3rd Floor - Rough MEP inside and brickwork on the exterior. |
Canopy at entrance. |
Door frames ready to install. |
|
Installation of windows. |
Strength Training room drywall installation (viewed from the Mezzanine). |
Strength Training facility, second floor. |
|
|
||
|
Tented scaffolding for last section of brickwork. |
Window Install - View of Red Rolfe Field. |
|
|
|
|
|
|
Strength Training room, drywall nearing completion. |
|
|