Skip to main content

Floren Varsity House : : Construction Images

Fall 2006

Photosets: October 16 :: November 3 :: December 21

 

Photos from October 16, 2006

101606_1

101606_2

 

Spray-foam insulation installed on the north face.

Insulation and wall/framing detail, north face.

 

 


Photos from November 3, 2006

110306_1

110306_2

110306_3

Perspective view of the East Stands and west face framing.

Another angle on the west face of the building.

North face, with foam insulation applied.

110306_4

110306_5

110306_6

Shower floor ready to be poured in the football
locker rooms, first floor.

Large meeting room/classroom, first floor.

Strength Training facility, second floor.

110306_7

110306_8

 

Another view of the Strength Training room.

Interior detail of the walls and framing.

 

 


Photos from December 21, 2006

122106_1

122106_2

122106_3

North face with brick applied, and brick being washed on the right.

View between Floren Varsity House and the East Stands, with
insulation foam applied.

Interior staircase.

122106_4

122106_5

122106_6

Detail of exterior wall and envelope layering.

Strength Training room, seen from the Mezzanine (north side).

Detail of curved ceiling structure, Strength Training facility.

122106_7

122106_8

122106_9

A closer detail of the curved ceiling framing.

Strength Training facility ductwork.

View of the Mezzanine from the floor.

122106_10

122106_11

122106_12

Large meeting room/classroom, with more framing installed,
first floor. Ready for drywall.

East side, looking north.

Another view of the east side with brick applied.

122106_13

122106_14

 

West side of the building, with foam applied and
bricklaying in progress.

West side view, looking north at Alumni Gymnasium.

 

 

Last Updated: 11/5/08