Column footings placed at interior of the building. |
Forming the foundations of the East Stands. |
Forming the East Stands extension foundations. |
|
Front of East Stands removed, and setting of the track curb. |
East Stands being prepared for reconstruction of ADA seating areas. |
Future lobby foundation complete; waterproofed and insulated. |
|
Future elevator. |
Future football locker room with interior foundation columns formed. |
Future steam line entrance. |
|
Layout of future public restroom. |
Overall view. |
Site overview. |
|
Trimming rebar for East Stands foundation. |
Waterproofing installed on foundation wall. |
West wall foundation completed, backfilled, and ready for steel. |
|
Erection of first steel columns at north end. |
Steel erection of columns and first floor beams. |
North block of steel columns. Front of stands |
|
Track surface ready for asphalt. |
View from West Stands. |
View to the north from West Stands. |
|
View to the south from West Stands. |
Foundation for public restroom facility. |
Steel columns and first floor beams. |
|
Crane at work. |
Foundation for restroom facility. |
Foundation for restroom facility. |
|
Views from the West Stands. |
Views from the West Stands. |
Views from the West Stands. |
|
Third floor steel on the north block. |
Foundation and sitework at Leverone. |
Final pours of the foundation -- south footings. |
|
Steel erectors at work. |
West wall of foundations. |
West wall again. |
|
Second floor deck installed. |
Steel and deck installation. |
Crane operator watching placement. |
|
Building structure and stands. |
Steel placement. |
Crane at work. |
|
Views from the West Stands. |
Views from the West Stands. |
Views from the West Stands. |
|
North block of steel. |
Foundation for stand extension. |
Overall view to the north. |
|
Building steel. |
Floor deck on second floor, mezzanine, and first floor. |
Steel installation. |
|
Footing for restroom facility. |
Future canopy at main entrance. |
Footing for restroom facility. |
|
East stands and building; asphalt on the track. |
Expansion site for East Stands. |
South foundation wall. |
|
Foundation walls for restroom facility. |
Steel and decking. |
Restroom facility foundations. |
|
Remodeling of the front end of the East Stands. |
Future ADA seating. |
View from the West Stands. |
|
Rebuilding the front of the East Stands. |
Second floor, mezzanine, third floor and roof deck. |
Building steel. |
|
South foundation wall. |
Steel. |
Cover skirt at East Stands. |
|
Verifying correct installation. |
Lifting steel into place. |
Waterproofing of foundation. |
|
Steel installation. |
Backfilling restroom foundation. |
Waterproofing. |
|
Waterproofing foundation wall. |
Cross-bracing to stiffen building. |
Steel. |
|
Steel. |
East Stands. |
Overall view from Memorial Field. |
|
|
|
|
|
Temporary handrails. |
|
|
Photos from August 31, 2006 -- Final piece of steel!
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|