Hitchcock Hall Renovation : : Construction Photos

Winter 2007

Photosets: February 22

 

Photos from February 22, 2007

 

022207_1

022207_2

022207_3

South wing of Hitchcock, third floor.

West wing, third floor.

Northeast corner, third floor.

022207_4

022207_5

022207_6

Main stairwell, from the third floor.

West wing, second floor.

South wing through the doorway, second floor.

022207_7

022207_8

 

022207_9

Remaining old flooring, bonded to the concrete.

Inside the south wing, second floor.

South wing stairwell, second floor.

022207_10

022207_11

022207_12

Concrete/steel connections, main stairwell.

Detail of concrete/steel structure, second floor.

Main entrance (north) from the inside.

022207_13

022207_14

022207_15

South addition, scheduled to be demolished.

Concrete piers/footings, basement.

Steam lines and drainage ditch, basement.

022007_1

 

 

Exterior, from the north (February 20, 2007).

 

 