|
South wing of Hitchcock, third floor. |
West wing, third floor. |
Northeast corner, third floor. |
|
Main stairwell, from the third floor. |
West wing, second floor. |
South wing through the doorway, second floor. |
|
|
||
|
Remaining old flooring, bonded to the concrete. |
Inside the south wing, second floor. |
South wing stairwell, second floor. |
|
Concrete/steel connections, main stairwell. |
Detail of concrete/steel structure, second floor. |
Main entrance (north) from the inside. |
|
South addition, scheduled to be demolished. |
Concrete piers/footings, basement. |
Steam lines and drainage ditch, basement. |
|
|
|
|
|
Exterior, from the north (February 20, 2007). |
|
|