Hitchcock Hall Renovation

Project at a Glance
|
Type Of Project:
|
|
Residence Hall, Full Renovation
|
|
Gross Square Footage:
|
|
32,300
|
|
Number of Beds:
|
|
86
|
|
Estimated Construction Cost:
|
|
$8,656,000
|
|
Start of Construction:
|
|
November 2006
|
|
Occupancy:
|
|
January 2008
|
|
Architect:
|
|
Atkin, Olshin, Lawson-Bell
|
|
Construction Manager:
|
|
Pizzagalli Construction Company
|
Hitchcock Hall is undergoing a full renovation, including exterior and site improvements. Project features include:
- Removal of all asbestos-containing materials and other hazardous materials, including the demolition of all interior partitions
- Create new fire-rated stairways at appropriate locations for safe emergency egress
- Provide full accessibility to persons with disabilities, including installation of an elevator
- Provide new room layouts to meet the density and program objectives of the Office of Residential Life; primarily single- and double-occupancy rooms with suite offerings
- Provide new private and semi-private toilet and shower rooms
- Replace all mechanical, plumbing and electrical systems, including new perimeter radiant heating, and ventilation of toilet/shower rooms and group assembly/lounge spaces
- Insulate the building and install new high-performance window systems
- Provide new millwork, with sensitivity toward the historic qualities of the building
- Install fire suppression (sprinkler) system and new fire alarm system
- Install new site and building perimeter drainage systems
- Remove parking from south lawn and re-plant with grass
- Improve exterior lighting and pedestrian walkways
- Provide emergency power to building electrical systems
- Provide new finishes throughout, including floors, wall, ceiling
- Provide new student kitchen and kitchenette facilities
- Install new windows
- Repair and replace shutters, re-point brick masonry
- Provide new site amenities, including seating and bicycle racks