Site ID: 789 Lat. 44.7037 Romania 0
River: Jiu Long. 23.0890
Site name: 0 Contributing area: 1144 km2 Ratio to Comparison Station: 0.05
Latest measurement: 1-Dec-09 Mean annual runoff: 163 mm (2003-2007)
Hydrologic status: 2 Normal flow Total runoff this year: 232 mm
Latest M/C ratio: 1.10 Seven day total: 1 mm
Estimated current discharge: 3 m3/sec Percent of mean 7-day total: 100.0 % (today's value compared to mean for same period, 2003-2007)
Ice-cover determination: 5 yr recurrence flood: 805 m3/sec (from Log Pearson III analysis)
Status Codes:  1 = Low flow, 2 = Normal flow, 3 = Flood, 4 = Major Flood 602 m3/sec (from Gumbel Extreme Value analysis)
Comparison Station Information:  Tokwe Confluence D/s C/s (1495240)       Contributing Area: 7280 sq mi 23237 sq km
(Data from this gaging station are used for the calibration to discharge, with an adjustment for different contributing areas)
Notes: Comparison station is placeholder, only; this site is not yet calibrated to actual discharge
Discharge and runoff, based on satellite remote sensing (NASA AMSR-E data)
(For U.S, sites, nearby ground station discharge may also be shown)
2008-Present
2002-Present
Annual  Monthly Total Runoff (mm), computed from above satellite-based discharge data
Runoff
(mm) Jan Feb Mar April May June July Aug Sept Oct Nov Dec
35 2002 no data no data no data no data no data no data no data 6.0 6.3 7.8 7.5 7.8
130 2003 7.8 43.0 12.5 7.5 7.8 7.5 7.8 7.8 7.5 7.8 5.8 7.8
172 2004 7.8 7.3 7.8 7.5 7.8 87.4 7.8 7.8 7.5 7.8 7.5 7.8
111 2005 7.8 7.0 34.5 7.5 7.8 7.5 1.0 7.5 7.5 7.8 7.5 7.8
76 2006 7.8 6.8 7.8 7.5 7.8 7.3 7.8 7.8 7.5 7.8 0.0 0.0
326 2007 7.8 7.0 7.8 7.5 7.8 241.8 7.8 7.8 7.5 7.8 7.5 7.5
232 2008 113.5 41.7 7.8 7.5 7.8 7.3 7.8 7.8 7.5 7.8 7.5 7.8
153 2009 7.8 7.0 7.8 7.5 7.8 7.5 75.5 7.8 7.5 7.8 7.5 1.0
Discharge is estimated directly via a rating equation from the remote sensing data (M/C ratio) shown below.
Explanation:   Green line records upwelling microwave emission from a land parcel (ca 10 km x 10 km) near the river; blue line from a parcel centered over the river.
Brown line is their ratio (M/C; scale on right) and is used to estimate river discharge via a rating equation.
Rating equations are being developed and applied on an individual basis. For calibration status, see "notes" entry, above.
When data above show calibration site values lower than for the measurement site, discharge estimation may not be possible.